# Hau Lee's Triple-A supply chain, read for exporters

## Key takeaways

- Lee (2004), drawing on 15 years of study of more than 60 companies, argues that chains tuned only for speed and cost do not keep an advantage. The best are agile, adaptable and aligned, and two out of three is not enough (Lee, 2004).
- Agility handles short-term shocks, adaptability follows structural shifts in markets, and alignment points partners' interests the same way. After the 2000 chip-plant fire, Nokia had backup sources and Ericsson did not (Lee, 2004).
- Lee's main alignment examples are led by the dominant firm in the chain. As I read it, exporters usually sit on the supplier's side, so for them the third A is a negotiation (Lee, 2004).
- One public figure on shocks: in August 2021 at least 103 seafood processing plants in southern Vietnam were shut temporarily, and VASEP said the plants still open had lost around half their capacity (SeafoodSource, 2021).
- "Gió Chướng", the furniture maker in the scoring table, and every number about it are invented by me.

In 2001 Cisco wrote off USD 2.25bn of inventory. Lee says that among several factors the main culprit was that Cisco's interests were out of line with those of its contract manufacturers, who stockpiled materials without regard to real demand, even as the US economy slowed (Lee, 2004). If you take orders from a foreign buyer, you sit where those contract manufacturers sat.

This post reads Hau Lee's [Triple-A framework](https://staging.khoi.co.uk/en/framework/triple-a-supply-chain) from that seat. It asks something different from the two earlier supply chain posts: [Uniqlo and outsourced production](https://staging.khoi.co.uk/en/blog/uniqlo-khong-so-huu-nha-may) is about holding quality in partner factories, and [Uniqlo and Zara](https://staging.khoi.co.uk/en/blog/uniqlo-zara-phu-hop-chien-luoc) about matching the chain to the product.

## Why does Lee say a fast, cheap chain is not enough?

Because, in his observation, chains made more efficient did not win a lasting advantage over rivals, and their performance slowly worsened. Lee cites this figure: the share of products marked down in the United States rose from under 10 per cent in 1980 to more than 30 per cent in 2000, while shoppers' satisfaction with availability fell sharply (Lee, 2004). The article gives no source for it.

The mechanism he describes is concrete. Many companies ship only full containers to cut freight cost. When demand for one item jumps without warning, goods already packed in the factory yard wait for the container to fill, which, according to two studies he helped run, delayed shipments by a week or more. The replenishment, a full container most distributors do not need, becomes excess stock and is marked down (Lee, 2004).

> **Figure:** [The Triple-A supply chain (agility, adaptability, alignment)](https://staging.khoi.co.uk/en/framework/triple-a-supply-chain) (redrawn from the site's library framework; origin recorded as Lee, 2004)

## How do agility, adaptability and alignment differ?

They differ in tempo and in what has to change. Agility is reacting fast to sudden shifts in demand or supply while holding cost. Adaptability is reshaping the network when market structures change. Alignment is making each firm, when it maximises its own interest, also maximise the chain's result (Lee, 2004).

**Agility.** In March 2000 a Philips plant in Albuquerque, which made radio-frequency chips for both Nokia and Ericsson, caught fire. According to Lee, Nokia changed designs so other firms could make similar chips and contacted backup sources; two suppliers asked for just five days' lead time. Ericsson had been trimming backup suppliers to save cost, had no plan B and scaled back production for months (Lee, 2004). Of the six rules of thumb Lee lists, the first is to leave no delay in information: every party sees the same supply and demand data at the same time (Lee, 2004).

**Adaptability.** Lucent built a fast, cheap chain in Oklahoma City. When Asia became the fastest-growing market it responded slowly, with no plant in the Far East. It fixed that with joint ventures, then was slow to see rivals outsource. Gap runs three chains for three brands (China, Central America, Italy) and accepts higher overheads, smaller buying scale and larger transport costs (Lee, 2004).

**Alignment.** Lee separates three layers: information, identities and incentives. He cites Saturn's service-parts chain: the company makes stocking decisions for dealers, shares the cost of excess stock and buys back parts nobody has bought in nine months. By Lee's account, parts availability at Saturn dealers is 92.5 per cent, against 70 to 80 per cent across the industry (Lee, 2004).

Lose one A and the chain breaks. HP and Canon split the work fairly and adapted reasonably well, but Canon would change output only if HP gave notice six months ahead, while HP could estimate demand only three months ahead. When demand for the LaserJet III fell, HP was stuck with a "LaserJet mountain" of printer engines (Lee, 2004).

## Where does an exporter sit in Lee's examples?

Mostly in the supplier's seat, which is where the framework is hardest on you. The three alignment examples Lee develops most fully are all led by the dominant firm: Saturn with its dealers, RR Donnelley sharing savings with its suppliers, Seven-Eleven Japan penalising delivery trucks that are more than 30 minutes late (Lee, 2004).

His passage on vendor-managed inventory (VMI) is closer to your position. Suppliers own the components until they enter the buyer's plant, so they carry inventory for longer, and many are small or medium-sized firms that borrow at higher interest than big manufacturers. The buyer cuts cost and the chain as a whole pays more (Lee, 2004). As I read it, an exporter holding timber or fabric against a buyer's forecast sits in exactly that spot.

A shock on the production side looks different. On 5 August 2021 SeafoodSource reported that at least 103 seafood processing plants in southern Vietnam had been shut temporarily by lockdowns; the Agriculture Ministry said only 82 plants met the conditions to operate, and VASEP said capacity at the plants still open was down by about half (SeafoodSource, 2021). The article does not say which plants had contingency plans, so it cannot tell us who was more agile. It only shows the scale of a shock.

## How do you score the three A's for an exporter, and what do you fix first?

Ask five questions drawn from what Lee recommends and score each 0 (absent), 1 (partly) or 2 (in place and working). The example is entirely invented: "Nội thất Gió Chướng", every number and the scale are mine.

Suppose Gió Chướng makes outdoor furniture in Bình Dương. Two US importers take 55 and 30 per cent of its sales and a German retail chain takes 15. In spring the larger importer often raises an order by 40 per cent with eight weeks to go, while the factory can add at most 10 per cent.

| What Lee recommends | Question | Gió Chướng (invented) | Score |
|:--|:--|:--|:-:|
| Agility: continuous information | Does the buyer send retail sales, or only purchase orders? | One spreadsheet of purchase orders a month | 0 |
| Agility: postponing differences | How many models share a frame and differ only at the last step? | 9 of 14 models share a frame | 1 |
| Agility: dependable logistics, contingency plan | If the shipping line or hardware supplier fails, who does what within 48 hours? | A second forwarder's number, no written plan | 1 |
| Adaptability: watch supply, markets and end customers | Where will your customers and timber be in three years? | Someone tracks import duties each quarter; nobody studies the end buyer | 1 |
| Alignment: share risk and cost | If the buyer cancels after you bought materials against its forecast, who pays? | Contract covers finished goods only; the factory bears the materials | 0 |

Total 3 out of 10: agility 2 of 6, adaptability 1 of 2, alignment 0 of 2. The zeros at the top and bottom are linked: the factory receives forecasts without knowing whether goods are selling, then carries the materials it bought against them. Like HP and Canon, the maker needs longer notice than the buyer gives; Gió Chướng is on Canon's side.

In my view the first move is to ask the buyer for data, not money. Gió Chướng could ask both importers for weekly retail sales and a rolling 12-week forecast, and in return promise to reply within three working days. The second move is a rule for sharing the cost of materials bought against forecasts, along the lines of Saturn's buy-back of unsold parts; but Saturn makes the stocking decisions and Gió Chướng does not. With the buyer that holds 55 per cent of sales, that is a hard ask, so open with a one-season trial.

This suits you if you have repeat orders from a few buyers and enough trust to ask directly. It does not suit you if you subcontract for a single customer and no information flows your way: the agility questions can still be worked on inside the factory, while the alignment question only measures your dependence. The five questions are my inference from Lee, not tested against data on Vietnamese factories.

## Going deeper: what did I read, and what could I not check?

I read Lee's article in full, as the reprint R0410F of Harvard Business Review (October 2004), through a PDF hosted on IBM's server; the HBR page in the library gave me only the abstract. My copy numbers its pages 1 to 10, which does not match the journal's pages 102 to 112, so I give no page numbers when citing Lee. The site's framework page holds only a three-column table and one warning line, so every detail above comes from the article.

Limits of Lee: the evidence is a set of chosen cases, mostly big firms in electronics, retail and cars. He says he studied more than 60 companies but does not explain how cases were chosen, so I cannot tell whether the examples are representative. I have not checked Lee's figures against independent sources. He promises to show how to build the three A's without trade-offs, yet the Gap example admits higher overheads, smaller buying scale and larger transport costs (Lee, 2004).

For Ivanov (2020) I read the abstract, the introduction and the definition of the viable supply chain, in the full text on Europe PMC, not the whole paper. Ivanov places Lee (2004) in the lean, agile and leagile strand, then adds resilience and sustainability (Ivanov, 2020). He ties agility to reacting to positive change, while Lee uses the word for shocks such as an earthquake and a fire too.

I read the SeafoodSource report through a Wayback Machine copy because the original site blocks automated access, and I have not opened the sources it cites (the newspaper Thanh Niên and VASEP). This post does not show that the Triple-A makes an exporter richer; it only explains the framework.

## Frequently asked questions

### Does a Triple-A supply chain need new technology?

Lee says no. He writes that when he describes the triple-A chain most companies assume it will need more technology and investment, and that this is untrue: most firms already have the infrastructure, and what they lack is a fresh attitude and culture, because no technology does those things for them (Lee, 2004). That is the author's view. The article gives no figures comparing the cost of a triple-A chain with an ordinary one.

### Can a small exporter apply the Triple-A?

The article does not discuss small firms. Lee's examples are large companies such as Cisco, Dell, Nokia and Saturn (Lee, 2004). My inference is that the agility and adaptability questions can be answered with records and internal meetings, while alignment depends on whether the buyer will sit down with you. I have not read a study that tests the framework in small exporters.

### Can I work on one or two of the A's first?

Lee says any two are not enough: only firms that build all three pull ahead of rivals. He describes HP and Canon as aligned and adaptable but not agile, so when demand fell HP was left with a mountain of printer engines (Lee, 2004). Which to fix first is still your call, starting from your weakest point; the scoring table in the post is one way to choose.

### How does the Triple-A differ from Ivanov's viable supply chain?

Ivanov (2020) combines agility, resilience and sustainability into a viable supply chain and calls resilience the central perspective (Ivanov, 2020). I found no sustainability axis in Lee's article, and Ivanov's paper draws lessons from COVID-19. The two split agility and resilience differently, so read them as two lenses, not two names for one thing.

## References

- Ivanov, D. (2020) ‘Viable supply chain model: integrating agility, resilience and sustainability perspectives’, *Annals of Operations Research*, 319(1), pp. 1411–1431. https://doi.org/10.1007/s10479-020-03640-6
- Lee, H.L. (2004) ‘The triple-A supply chain’, *Harvard Business Review*, 82(10), pp. 102–112. Available at: https://hbr.org/2004/10/the-triple-a-supply-chain.