Framework
Toyota Production System: four pillars
The question it answers
When a plant has high stock, recurring defects and uneven output, which pillars should an operations manager build on to run production steadily with little waste?
- Origin
- Slack et al. (2022) ch. 16
- Diagram type
- Hub diagram
- Level of analysis
- Firm

Diagram
Toyota Production System: four pillars
TPS
Just-in-time (pull)
Jidoka (stop at defects)
Eliminate the seven wastes
Level scheduling
Sources
References
Listed A–Z by author surname, Harvard style. A source with a DOI links to https://doi.org/…; one without links to its page or says plainly that it has no DOI.
- Slack, N., Brandon-Jones, A. and Burgess, N. (2022) Operations Management (10th edn). Harlow: Pearson.No DOISource page